Day of Deployment 8-19-20


WK0080

Deployment Name | Date:
Glen Peel Phase 2, SE | 08/19/2020

DESCRIPTION:
This deployment is one of four patch reefs deployed as Phase 2 of a memorial reef to honor the memory of Glen Peel a Wakulla county resident who was lost during a recreational diving operation offshore of Shell Point, Florida.

Primary Material:
Concrete culverts and repurposed concrete slabs from old Port Panacea dock

Tons: 75

Jurisdiction: Federal
This is a Memorial reef. - more information



LOCATION:
Reef Area: Wakulla

LAT: 29 50.324 N
LONG: 84 09.345 W
DEC_LAT: 29.83873
DEC_LONG: -84.15575

RANGE: 14
BEARING: 176 from the St Marks Lighthouse
Range and Bearing from St Marks Birdrack (NM)

Depth: 30 ft

REEF SURVEYS:
No surveys available

REEF VIDEOS:
No videos available

REEF PHOTOS:
Day of Deployment 8-19-20 Day of Deployment 8-19-20 Day of Deployment 8-19-20